Stenhoj Ds2 Manual ((better)) -

Proper site preparation ensures the safety and longevity of your lift. 1. Floor Requirements Reinforced concrete only. Thickness: Minimum 150 mm to 200 mm depth. Strength: Concrete must handle at least 3000 psi.

Check for debris blocking one of the carriage rollers. Excessive Noise stenhoj ds2 manual

Drill holes into the concrete through the base plate holes.Use high-quality expansion anchors or chemical resin anchors.Torque all bolts to the manufacturer’s specified settings. Step 4: Connecting the Top Crossbeam Proper site preparation ensures the safety and longevity

The lifting screws require immediate lubrication. Worn Bearings: Top or bottom bearings may need replacement. stenhoj ds2 manual